works

ITAMA 75' PAINTING

Completely repainted during winter 2016-2017 at Alfamarine, this Itama 75' was treated with a double layer process of an opaque polyurethane paint and a transparent finish. The choice of the green tint for this yacht makes it unique of its kind, being the only Itama 75' with this colour.

PASSERELLE INSTALLATION IN AN ITAMA 75'

Kept in the Alfamarine shade during the winter, this Itama 75' has undergone numerous modernization works including the installation of a new passerelle. After having modified part of the fiberglass structure of the boat, adjusted the teak deck and built a new exhaust pipe of one of the two engines in order to create space for the new system, a longer passerelle was installed. Then, the painting department refinished it according to the pre-existent coloration.

TEAK DECK FOR AN ITAMA 75'

The bow deck of this Itama 75', previously finished with an anti-slip surface, was covered with a teak pavement of about 50 m2 at Alfamarine. After having adequately prepared the surface for the bonding, having chosen and cut the wood, the teak was smoothed out with specialized machinery in order to create a uniform surface.